Video: CDI brings down Arizona’s Pinto Creek Bridge
NDA News
On: November 18, 2021 | By:
Controlled Demolition Inc. (CDI), Phoenix, Maryland, performed the design for, and explosives felling of, two 350-feet steel girder arches that supported the Pinto Creek Bridge deck crossing Rattle Snake Canyon in Pinal County, Arizona, on Oct. 27.
Watch the video and read more in the link below.
Back to Demolition Insights Home